News Projection 501 Update
January 08, 2019
Edit
Beta timeline alongside sporadic HV YXRs is secured (GBNF+, n=2), alongside hyperphasic grid activated. Internal YXR menstruation recovery is inwards progress.
HVBN intersection (PHI 3.2, P 0.90, THETA 0.83, VTXPOS 2.0) is unstable as well as requires GBNF safety piece application, fourth dimension calibrated alongside integration bend as well as triangulated alongside other YXRs / HVBNs.
LJVTX protocols inwards execution, LOC safety piece required.