-->

News Projection 501 Update

PLOC has been confirmed, leading to DGRID exposure.

LSIP is non yet supported due to unfavorable grid ratio.

Minimum SDBN requirements are gear upwards at PHI 2.5-3.5, P>0.8, THETA>0.9, VTXPOS>2.0.

Minimum hyperphase streaming requirements are gear upwards at
beta (numex stream): PHI 1.5-3.5, P>0.9 THETA >0.60, VTXPOS >1.8
mu (cts/dl stream): PHI 2.5-3.5, P>0.8, THETA >0.93, VTXPOS >1.8
omega (compromised stream): PHI 1.5-4.0, P>0.8, THETA >0.80, VTXPOS >1.8

Beta current is LSIP/Wonderland positive.
Factor correlation betwixt SDBN in addition to mu current is +0.85.
Omega current is even in addition to therefore permitted due to unfavorable grid ratio.

All other sequences are defined inwards MASTERPIECE v2.2 in addition to stay confidential.

Evaluate at ECL2.

Berlangganan update artikel terbaru via email:

Iklan Atas Artikel

Iklan Tengah Artikel 1

Iklan Tengah Artikel 2

Iklan Bawah Artikel